The Day out of Days (DOOD) is a chart that shows, for each actor, which shoot days they work, when they start, when they finish and which days they're held without shooting. It comes straight out of the shooting schedule and it does two jobs: paying cast (every day an actor is called or held is usually paid) and reordering the schedule so nobody gets paid to wait when they don't have to. Here are the codes, a full example and how to read it to save days.
The codes
| Code | Stands for | Meaning |
|---|---|---|
| SW | Start Work | The actor's first working day |
| W | Work | A working day in between |
| WF | Work Finish | The actor's last working day |
| SWF | Start Work Finish | Works a single day: starts and finishes the same day |
| H | Hold | A held day: the actor doesn't shoot but is reserved, and under many contracts is paid |
Larger productions add more codes (travel, rehearsal, fitting). These five are the core.
A full example: «The Clothesline» over three days
The short from silent short film script has four characters. In the budget it shoots in two days; here we spread it over three to show how a hold appears. First draft of the schedule:
- Day 1 (rooftops): scenes 2, 4 and 5 (Luz and the montage, with Mateo).
- Day 2 (rooftops): scenes 1, 3, 6, 8 and 9 (Mateo alone; the new neighbor in 9).
- Day 3 (alley): scene 7 (Luz, her mother and the movers).
Its Day out of Days:
| # | Character | Day 1 | Day 2 | Day 3 | Work days | Hold days |
|---|---|---|---|---|---|---|
| 1 | Mateo | SW | WF | 2 | 0 | |
| 2 | Luz | SW | H | WF | 2 | 1 |
| 3 | Luz's Mother | SWF | 1 | 0 | ||
| 4 | New Neighbor | SWF | 1 | 0 |
How to read it
- Each row is an actor, numbered as on the schedule (1 is usually the lead).
- Each column is a shoot day, not a calendar day: a day off doesn't appear.
- Empty cells before SW or after WF aren't paid: the actor hasn't started yet or is done.
- An H between SW and WF is the number that matters: Luz waits on day 2 without shooting, reserved.
What this example tells you: move one day
Luz is a minor and has a hold in the middle. Reorder the schedule to shoot the alley (day 3) right after her rooftop scenes, and you get:
| # | Character | Day 1 | Day 2 | Day 3 | Work days | Hold days |
|---|---|---|---|---|---|---|
| 1 | Mateo | SW | WF | 2 | 0 | |
| 2 | Luz | SW | WF | 2 | 0 | |
| 3 | Luz's Mother | SWF | 1 | 0 | ||
| 4 | New Neighbor | SWF | 1 | 0 |
Now Luz works two days in a row and wraps on the second: no hold. But Mateo now has a blank day in the middle (day 2): if he's paid by working day, he isn't paid for it; if he's booked for the whole week, it becomes an H. That's the trade-off the Day out of Days shows you before the shoot.
With minors, local rules also cap working hours per day: grouping their scenes helps you stay within them.
What else it's for
- Budgeting: each actor's work and hold days go straight into the cast line (see short film budget).
- Contracts: you tell each actor which days you need them before they sign.
- Call sheets: actors with an SW on a given day need wardrobe and makeup prep first; those with a WF need wrap continuity photos. How call sheets work is in call sheet.
Day out of Days in Scriptico
In Scriptico, the Day out of Days builds itself from the shooting schedule: drag a strip to another day and the chart updates, so you see right away who just picked up a hold. It's on Pro and up, with the stripboard, calendar and call sheets. The schedule comes from the script and its breakdown: see how to break down a script and shooting schedule.
Frequently asked questions
What is a Day out of Days?
A shooting schedule report that shows, for each actor, which days they work, when they start and finish, and which days they're held. It's used to pay cast and to rework the schedule.
What do SW, WF and H mean?
SW is an actor's first working day (Start Work); WF, their last (Work Finish); SWF, an actor who works a single day; and H, a hold day, when they don't shoot but are reserved.
Are hold days paid?
That depends on the contract and on local rules. On many shoots, yes: the actor is reserved and can't take other work. That's why you try to reduce them.
Does a short film need a Day out of Days?
If the shoot runs more than one day, yes: even with three actors, it tells you how many days you're paying each one and whether there are holds you can avoid.